CIS/2

Table of Contents

AISC CIS/2 Workshop #2

Objectives

Context

Why?

Why D> CC Proposed

Why D> CC Proposed

Why D> CC Proposed

Why D> CC Proposed

How?

How D> CC Assembled

How D> CC Assembled

How D> CC Assembled

Resulting Excel Spreadsheet

Resulting Excel Spreadsheet

How, in Greater Detail

How D> CC Assembled

Build Short Form

How D> CC Assembled

Build CC501 Short Form

CC Refinement Cycle

CC Refinement Cycle

How D> CC Assembled

Refine Short Form: 1 of 2

Refine Short Form: 2 of 2

How D> CC Assembled

How D> CC Assembled

Refine Short Form

Refine CC Entity

Refine CC Entity

Refine CC Entity

Refine CC Entity

Refined Short Form

Refine Short Form

Refine CC Entity

Refine CC Entity

Refined Short Form

Functionality Constrained

The CC501 Short Form

The CC501 Short Form

The CC501 Short Form

Repeat for CC502

Build CC502 Short Form

Repeat for CC502

The CC502 Short Form

Complete the Task

The CC503 Short Form

The CC504 Short Form

The CC504 Short Form

PPT Slide

The CC504 Short Form

What is Included?

Proposed Scope of each CC

End

Conformance Classes

Click here to start

Author: Alastair Watson

Email: a.s.watson@leeds.ac.uk

Home Page: http://www.leeds.ac.uk/civil/

Other information:
Slides presented at the 2nd AISC CIMsteel Workshop 22nd-25th June 1999

 

CIS/2 - online

This web site is hosted and maintained by 

SCI Home PageThe Steel Construction Institute

Copyright © 1999, 2000, 2003.  All rights reserved. 
Last modified: Tuesday February 22, 2000.

Questions or problems regarding this web site should be directed to Andrew Crowley.

CIS/2 is based on deliverables of the Eureka EU130 CIMsteel Project.

cimsteel_logo.gif (2358 bytes)

Copyright ©  The CIMsteel Collaborators.
CIMsteel is a Registered Trademark.

Other products mentioned are registered trademarks or trademarks of their respective companies